Orascom Development Egypt · Al Bahr al Ahmar, Egypt · Posted 2026-08-02
• Perform and supervise corrective and preventive maintenance activities for all RO units and associated equipment. • Follow up on daily measurements, logs, and performance records to ensure proper plant functionality. • Ensure the production quality of the water meets company standards and regulatory requirements. • Monitor, review, and adjust RO parameters (pressure, flow rates, recovery ratios, chemical dosing, etc.) as needed. • Ensure the availability of all required spare parts, consumables, and tools. • Follow up on chemical and material inventory in the stores, and coordinate timely replenishment. • Lead troubleshooting activities during plant abnormalities or performance drops. • Coordinate with the laboratory team for regular water quality testing and take action if deviations occur. • Prepare and submit daily, weekly, and monthly operation reports. • Ensure compliance with HSE (Health, Safety & Environment) standards inside the plant. • Supervise plant operators and technicians and ensure proper training and adherence to SOPs. • Support management in planning plant improvements, upgrades, and energy/efficiency optimization. • Coordinate with the Ministry of Water Resources and Irrigation to complete the procedures and obtain the required permits for the plant’s groundwater wells.Key requirements: • Must hold a Bachelor’s degree in Engineering. • Must have hands-on experience in operating and maintaining RO desalination plants. Proposed Roles & Responsibilities for the Assistant Manager – RO Desalination Plant: • Oversee the daily operation of the RO plant and ensure smooth, continuous production.
Orascom Development Egypt is a real estate developer building integrated towns including the Red Sea destination of El Gouna and other resort and residential communities. The company is part of Orascom Development Holding, listed on the SIX Swiss Exchange.