Electrical Testing & Commissioning Engineer (high voltage)

INP Egypt LLC · Cairo, Egypt · Posted 2026-05-18

Location in Erbil (power plant)Equipment: 2 pole air cooled generator Manufacturer: SiemensRated Power: 204,000 kVASpeed 3,000 rpmLocation: Erbil - IraqSite assignment duration: 4 working days/10 hours/day, Friday rest.Accommodation provided in a hotel in Erbil with secured transport arrangement from hotel to site (1 hour) and vice versa.Outage window between [07 -14 June] 2026The scope is based on the existing installed generator, protection, and control systems.No control system upgradeGenerator Protection and Safety VerificationReview and verification of existing generator protection relay settings against available setting documentation.Functional verification of generator protection and safety functions as installed, including alarms and interlocks available in the existing control system.Support of generator-related Safety Inspection (SI) and commissioning tests within the defined outage window in [07 -14 June] 2026 for the STG #2.Control System Interface Checks (As-Is)Verification of signal exchange and alarm visibility between generator protection relays and the existing PCS7/SCADA system without modification.Observation and documentation of interface limitations or discrepancies for reporting purposes only.No re-engineering, re-configuration, or parameter modification shall be performed.Explicit Exclusions (i.e, Not Included)The following activities are explicitly excluded from this Scope of Work:Control system modernisation, upgrade, or replacement (including PCS7 hardware or software)Modification of control logic, protection logic, or IEC-61850 configurationCorrection of signal mapping, alarm assignment, redundancy faults, or communication bus issuesReplacement or upgrade of Operating System computers, CPUs, network components, or field devicesDetailed fault troubleshooting beyond observation and reportingMechanical repairs or dismantling of generator componentsAny services exceeding four (4) on-site working daysNotes: Any findings requiring corrective action shall be treated as recommendations proposed to Siemens Energy project manager for internal review and approval with engineering department.Borescope inspection of the generatorVisual inspection with a borescope included:Stator end winding on the EE(CE) and TE(NCE) sides (OCP and ECP areas).The area under the generator rotor retaining rings (rotor end winding / spacer blocks / J-straps EE(CE) side).Stator winding insulation resistance test

Apply for this role

Other open roles at INP Egypt LLC

See all 2 open roles at INP Egypt LLC →

Related jobs in Engineering & Construction